12 tanks erection with a total capacity of 2.2 million bbl
Dock construction: 5,250 m2, including offshore works and offloading arms
Procurement of steel plate, pipes, electrical and instrumentation materials
Foundations for tanks, equipment and rack, road paving's, 6km of railroad
Supply and construction of more than 2,000 Tons of galvanized steel rack
Procurement and installation of 300,000 diametral inches of piping, electrical and instrumentation equipment
Commissioning of the full terminal
High safety standards and low environmental impact