Engineering, procurement and construction of a 327 km pipeline system with 36” diameter
Civil, mechanical works and construction of access roads
Interconnection with the compression station
Optical fiber and solar panels installation
River and roads crossings
Metering Station and valve installation
Pipe yard construction
High safety standards and low environmental impact