Engineering, procurement and construction of a 450 km pipeline system with 48” diameter.
Civil, mechanical works and construction of access roads.
Interconnection with the compression station.
Optical fiber and solar panels installation.
River and roads crossings.
Metering Station and valve installation.
Pipe yard construction.
High safety standards and low environmental impact