Construction of 830 km of pipeline, 36” diameter
Civil, mechanical works and construction of access roads
Interconnection with the compressor station
Optical fiber
River and roads crossings. (Direct pipe methodology and HDD)
Metering Station and valve installation
Pipe yard construction
High safety standards and low environmental impact